WORKS COMPLETED IN 2017

Public Works and Infrastructure Department is pleased to present the work completed in 2017:

Reconstruction of chemin de la Montagne
Cost of the project: $ 3 036 500 

 

 

Reconstruction of chemin Hendrick
Cost of the project: $ 684 000 

 

 

Paving of the shoulders of Route 105
Cost of the project: $ 366 000

 

 

Reconstruction of chemin Kingsmere
Cost of the project: $ 371 000 

 

 

Drainage of chemins Meredith and Wallace
Cost of the project: $ 360 000 

 

 

Dismantling of the railway
Cost of the project: $ 156 000 

 

 

Surface treatment on several roads:

•      de la Colline;
•      Ditchfield;
•      Du Manoir;
•      Lilsam;
•      Loretta Loop;
•      McNally;
•      Montée des Cerisiers;
•      Montrose;
•      Musie Loop;
•      Preston;
•      Solitude;
•      Beausoleil;
•      Terrasse du Domaine.

Cost of the project: $ 443 500 

 

 

Sealing cracks on several roads:

•      Swamp;
•      St-Clément;
•      Du Ruisseau;
•      Carman;
•      Route 105.

Total : 15 000 linear meters

Cost of the project: $ 24 500